When a local boarding school needed its heating circuits replaced ahead of the new term, Rebur were appointed to deliver the full design before the summer closure window. The project spanned a building that has grown and evolved over many years, with listed sections adding an extra layer of design consideration. Our outputs included heat loss calculations, pipework sizing, equipment selections, and a full construction drawing package, schematics and equipment schedules for valves, radiators, radiant ceiling panels, fan convectors, and electric panel heaters